Temporary power pole cost reddit. A cost estimate will be provided.
Temporary power pole cost reddit Need a Quote? Request a Quote. It ends up being less cost effective. Because the telephone probably has the maintenance contract for the poles and they will do everything in their power stop/stall you from using those poles. I never knew the I have a lot in an old farm field with a very small right of way. The secondary line to my power pole is 2 120amp lines and a negative line. Large power poles are easier to set up, due to needing fewer. Proud Sponsor. I used an angle grinder to cut a notch in the rod and used some picture hanging wire to twist. Step 2 : Buy a temporary power pole from the hardware store. Hi guys, I'm installing a temporary service pole while my home is under construction. Yeah it was a pretty frightening experience. In the video below, Share Facebook X Pinterest Tumblr Reddit WhatsApp. We are a family of 4 but our kids are 10 & 11 so they're pretty self-sufficient. Trying to determine if a pre-fab/modular tiny house/cabin is the best route or just get a RV/Fifth Wheel to live in. I'd like to use an old outdoor box I have laying around. We will be RV living during the build; hoping for 6-8 months of RV living and transitioning to the house as it comes on line. Menu. e had to pay for 85m), ~$3000 + tax. Can an HOA An Electric Tankless unit might be an option, but they too use a great deal of energy so your house may not have enough electrical service from PSE, or your panel might need to be upgraded. Metered servers get a specific amount of bandwidth measured in GB per month, meaning I beleive the first 2 poles are paid for by your utility company then after that its about $200 per pole. 1688 now. Set a pole with meter can and breaker box have power company hang overhead to said power pole then when there done bring in RV. If I wanted any more amperage I'd probably need the Provincial Power company to install a new power pole setup at my cost. Some utilities companies will also set-up the Meter socket install on temporary power pole So I'm wiring an underground service temporary power pole and have come to a standstill. Some green snow fence and some fence rods. Underground distribution can be 10x the cost of overhead. Thats how it is in my area in NY. 12 per kilowatt hour. Worked awesome and can remove if needed as the grey pipe is flush with ground. The power bill is already high enough, it would 4-6 times the cost it is now. If you grant access, you do have some control of the route and easement. The only reasons that they would want to replace a utility pole is if the existing pole is damaged/compromised, or if the pole needs to be moved for construction purposes. We replaced 3 pole lengths (distance from pole to pole) maybe 4. A bare slab is usable, containers are usable, and they remain usable while erecting the shell. Overhead Configurations. In TX, I was allowed to pull power off my neighbors poles based on the easement agreement for them to get power. A Reddit for Solar Power enthusiasts, the latest news on Solar Technology, So the “right way” to do it would be to install conduit 24” underground. Due to insurer mandates they cannot reuse poles. Business, Economics, and Finance. Some utility companies will bring it from the street to your ready made pole. LOCAL ADDRESS: 1045 S Greenwood Ave, Montebello, CA 90640 • LOCAL PHONE: (323) 838-1800. Weave the rods through the fencing every 8' or so. Even if you can get an electric tankless water heater installed it will cost about 3x as much to operate as a tankless gas unit. In my opinion it was superior to Powerpole in many ways (cheap, readily available, didn't need special tools, took solder well or could be crimped reliably using a $5 tool, easily installed and repaired in the field). First time I've had a private power pole I thought Western Power would have tradies that fix it but seems you need to get it done through a private company and I'm just wondering if anyone else here has Trouble shooter from the power company arrives and finds the pole needs to be replaced. Bass Pro Shops sells 16' telescoping rods that are plenty rigid enough for the job, and they cost about $25. Easements can be used without having to deal with that added hassle. With our industry experience and expertise, we help you with builders pole hire in Brisbane and surrounding suburbs to get the job done without stress. We are building on a wooded lot. The only lines attached to this pole are power lines; the telephone and cable come to the house from a different pole. my subreddits. 10 - $. It was way cheaper if I could run power across the neighbors lawn than down my driveway, but I needed an easement. The temperature is the cut off temp when the compressor kicks out. Outlets at CO Pole: For temporary power, I probably only need one 20 amp circuit for two 110v outlets and one 30 amp RV outlet box. Only picture I have of it up. Anyone know how much it costs to get temp power (100 amps) to my property. Find here detailed information about temporary power costs. Crypto This sub is for tool enthusiasts worldwide to talk about tools, professionals and hobbyists alike. Or check it out in the app stores Actual Costs would be Pole around $3,000 Admin and booking work $2,500 Pole Auger $2,500 for day Labour 4 x $90 x 8 $2,880 Linesmen 3 x $120 x 8 $2,880 Materials $1,200 Have you got power poles in the street cause it should be half that Also, feel free to ask me and others what were figuring out. I believe most pole buildings now use a laminated pole made with kiln dried lumber that will not twist or bow. It's rough. You set it up and done. It's generally a operation that doesn't take an extreme amount of time, and whether you will be out of power depends on if there's an alternate route for the power to get to you. Rent a Power Pole at Kennards Hire. There is a 3 metre ‘exclusion zone’ around a pole. Can I use a double pole breaker as the power input, to function as a main disconnect? This is single phase 240. Whole project was well over $100,000. it got approved, got power cut at the pole, finished my swap (dominion even brought me new service entrance wire and a meter base for free) Electrician pulled the meter to add another outlet to a temporary power pole and got hit with a damaged equipment fee because they had to replace the Here is a standard Temporary Power Pole assembly issued by the utility company that always seems to work if you follow it to the letter. You do realize that there is a granite ledge in most of the state of maine. The cost includes a permit and at least one inspection, the pole or post, meter box, two outlets and all the For residential service, permanent or temporary, many utilities require that equipment and wiring up to and including the meter enclosure be suitable for 200 amps. And on both proprieties i own. The rule for the requirement is so power to the bus can be turned off if you need to work in there. NSP gives you 92 meters from the nearest utility pole. I also remember they mentioned if they ran into problems setting the poles, there would be additional costs. The cost includes a permit and at least one inspection, the pole or post, meter box, two outlets and all the wiring and supplies required. Old school air conditioners are on or off which makes up just about any unit you will see in residential unless it's brand new or you went high end. OP would rather have free power than drop $50k on ugly poles and wires, and then have a power bill. There was a program 50 or so years ago that Duke Power (now Duke Energy) provided and installed the main service panels on new construction. I think half that is more like it, if the permitting is already done as part of the main project. This thread is archived New comments cannot be posted and votes cannot be cast He basically said the Power pole infront of my property has a transformer on it. Im a 17 year old in an advanced electric class so im not 100% on the price of the wire and all that since i dont have much real life experience with any of that. It was a big deal, cmp had 5 line crews there for a couple days. Its a frequent problem everywhere. lol A local power pole installer suggested a 200-Amp Cutler Hammer Meter Base & Load Center with 4 Space Circuits and 8 Single Pole Circuit, but it is not clear whether this can be used for permanent power. *Minimum Fees are billed Ohio Edison, The Illuminating Company, Toledo Edison $200. I believe it’s been about 4 years now and still up. The power company then transfers their lines to the new pole, and ties a rope to the old stub. I've also heard a couple pros that say it shouldn't matter. Because power poles primary function isn't intended to be 100% coverage. If the pole and wires are in a place they should not be then the onus will be on NSP to move them and cover expenses. Are all there other utilities buried in that area? Is there anything attached to the pole? More than likely that is just a temporary pole that contractors or home builder would put in that area so they could attach a power line to and then run temporary electric lines to the various houses so contractors can use their electrical equipment for the build. About a year ago it was $36. Any alternatives to an above ground installation given the temporary nature of it? Cannot go temp power poles either. The cost range for having a temporary power pole installed and connected to the electrical grid is $1,200 – $2,850. Energy company states that we need a pole tall enough so that the power line that will go across the street is at least 18' off the ground. (Some parts of the country can't dig trenches conventionally, so grinding or blasting rock may be even more costly. 15 minutes for this little experiment), but it would have We built a cottage. Or check it out in the app stores Surveys can cost thousands of dollars. There is no fee for that service. From 24-foot standard poles to 30-foot Black Diamonds, National’s professionals are expert However in some areas, power company may own the riser, the meter base, and the outside service panel. Visit us online or call at 135135 to hire Power Distribution and Accessories, tools and equipment for your residential, commercial, industrial and DIY needs. Power poles are intended to be used for small to Western Power are actually installing solar and batteries for remote properties themselves (for those that can't afford the upfront cost). I think every 40m or so they will need to add another pole (included in the $/m). When you see the temp poles being taken down call the engineer and ask if he has poles available. There are two main types of temporary power panels: metered and unmetered. California is absolutely ridiculous and a single pole can cost as much as $50k. City of Huntsville has replaced many poles but never come back to remove the old ones. Visit their Facebook page to see the Latest HBA Funny that Duke Energy is allowed to control who and how many residences can have solar in NC thus denying the citizens a lower cost, more environmentally friendly energy source. A pole shed style building sounds well suited. And doing so would make heat pumps a better match since the solar PV can power the heat pumps. A picture would really help. Met-Ed and Penelec fees are determined by the rate classification of the premise. The government setup monopolies to buy and guarantee OP's mortgage. They would need to move it from the pole, to a tap somewhere in the middle of the wire going between the poles. Our cost was $8,000. Temp pole should be inspected before the utility hooks up to it. DO NOT tamper with any part of a pole installation once completed. But it seems like so much work for just 3 weeks. Welcome to /r/Electricians Reddit's International Electrical Worker Community aka The Great Reddit Council of Electricians Talk shop, show off jump to content. The utility won't build it underground for free, so at some point the cost gets rolled into rates or development costs borne by customers. Temporary fix while replacing telephone poles. The most requested, most used and most cost-effective temporary power configuration is overhead power distribution. We welcome posts about "new tool day", estate sale/car boot sale finds, "what is this" tool, advice about the best tool for a job, homemade tools, 3D printed accessories, toolbox/shop tours. Add in the shit energy bills and your entry cost is now what monthly cost used to be, and we haven't even talked about people expecting pandemic bidding wars (owners are asking waaaay too much) and mortgage rates being high. The temporary builders pole and 2 support stays must be placed inside the work site property boundary and comply with Energy Safe Victoria’s Guidelines. Needed to pay for the transformer, and the pole nearest to the cottage could not support the transformer so it had to be replaced as well. I'm a home owner building a Temp pole and I feel confident in all wiring and all the things my PoCo needs from me. People still living out of air bnb and hotels n shit, trying to get back on their own property at least, so they call for temp power poles for an rv or new mobile home. This transformer will power me with 200amp and a neighbor with 200amp. I'm adding ~1500 to my monthly cost to account for insurance. The panels are MLO. It does not have a built in disconnect. 2 Generations of family (Grand father and Dad) have worked for First Energy, I can assure you that this is very temporary and will be fixed once they have a the right size pole and other resources required to replace it. Same goes for The Netherlands, literally all power lines run underground, except for transfer lines between power plants and power stations, which run through overhead cables on huge metal towers in the countryside. Temporary Power Poles in Los Angeles. We needed 3 poles, total distance ~180m (i. ) This will prevent delays and additional costs. it is also possible to clone the existing prototype and create a NEW item in the game that is a modification of the existing pole. A standard temp pole only has two 20A 120V circuits GFCI protected, and one standard 20A 2P 240V circuit connected to a Western power got blamed for the Parkerville fires even though it started on someones private power pole. 00 West Penn Power $470. Neighbor was out about that for his second. You are taking a substantial cost increase to dig deep enough thru ledge. For higher power they recommended a similar 4 pin. by ardenthusiast. We have a variety of temporary power solutions including temporary power poles. The cables that run up or down poles are disconnected at the top, dug out a bit by hand (right next to the pole) and laid down out of the way while the pole is replaced. I then slipped it onto the starlink pole, slid the starlink pole into the top of the flag pole then secured it with the two screws. Everyone is Alabama is getting screwed by the public service commission. It like $. Distance from the cottage to the nearest pole was about 100', give or take. 29/meter. Looks like this is a old pole. Perhaps water is also being sourced from this tenant. Do we need to replace them? My wife and I are looking to buy a new home and recently had the inspection, which revealed temporary support columns holding up beams in the basement. Get the Reddit app Scan this QR code to download the app now. As someone will have to pay for bazillion of miles of wires hanging over ledge. He makes temporary repairs enough to re energize the circuit, he puts in an emergency dig safe ticket, notifies management they need to call in men from home on overtime, and makes a list of what those men will need. The job seems simple, since nothing on the house would need to change, since panel and mast stays in the same place. I kept bugging them to remove old one from my yard. Then they cut the old pole above and before the third party attachers. They know the pole was bad, that’s why they replaced it They need to pay for the entire repairs, rental and ect. The RV must be where it is and the temp pole must be where it This is the Reddit community for EV owners and enthusiasts. There is no hard requirement in the underwriting guidelines of the Fannies to have electricity whatsoever. The ICOM 7300 I have is using what I assume are more traditional posts. You'll need something to secure the fence to the top of the rod. Our inspectors don’t typically inspect utility side connections in my experience, not sure why he would need it hooked up first. Probably could get away with zip ties. Any idea what a practical DIY solution is to get a pole built that tall? There's currently dilapidated homes on the build site - 2 septic tanks, a well, & power pole (meter guts were removed by the power company). If you have no equipment, and it really is 4' deep, I'd purchase a high lift jack and do like other said: screw a 2x4 to it and lift it up. Why should you risk your rates going up Are there pro's/con's to setting the temp pole at different stages? Opt 1 -- Before foundation Opt 2 -- Immediately after foundation (before rough-in) Opt 3 -- At time of electric rough-in (this is too late, right?) Sorry if this is a dumb question, just trying to understand the flow and timing, here. PRODUCTS; Under the right scenario, temporary power is a smart and low-cost alternative to other options on the market today. However, I'm still waiting for a temporary power pole and line. A post hole digger and a sledge to get the ground rod in and a Phillip’s screwdriver. 00 General Service: $560. Gathering quotes right now but curious if anyone can ballpark typical replacement costs for underground power line ? It will cost a few thousand for sure. Western Power has gave me a notice on Friday that my private power pole is defective due to the rust at the top of the galvanised steel pole. Anyone have paying the fees for the power company to hook up the transformer if there is one and to install the transformer, line, and hookup to the pole, mounting a breaker box For residential temporary power, the temporary pole price is indeed rather high. But we will need to coordinate with the electrician and the inspector (city/county) so that PG&E does the disconnect in the morning, we get the panel changed over and inspected during the day, and then after the inspection PG&E reconnects We provide fast, safe and reliable temporary power poles in Brisbane to suit a range of projects, from small domestic sites to large commercial size building sites offering temporary power supply for construction sites. LOCAL SERVICE AREAS . Single Phase (two wire) follows the side of my property. Before Powerpole, the ARES group in my area was standardizing on a 2 pin Molex connector. Surprising because the house is new but it is what it is and it's our responsibility. It has been over a Was informed by national grid we will need to replace the power line from the pole to the house because it's bad. Temporary Power Pole Installation. So now they're on a war path and forcing people to pay thousands of dollers to replace poles that only have a bit of surface rust and needed nothing more than a wire brush and some anti rust paint to fix. They run great in parallel with Get the Reddit app Scan this QR code to download the app now. Set up an assembler, and let it run. In Alaska they are much more reasonable and a fraction of the price. Over head lines are held up and out of the way by the bucket truck (or down out of the way with a ute or truck) other underground services should be a fair distance away from the poles and underground power Oooh lol. What you will need to do first is do a service upgrade, so schedule your power disconnect with the POCO, your service inspection and power reconnect with the POCO for the same day. . When demand is up. The thinnest section is a bit wobbly so you get about 13' of usable length, which can easily be bumped up to 18' with a piece of 1" PVC or similar. Search for: Go! Contact Us 800-352-5675. If they need more to get the line to your house, you pay per meter. PG&E can do a same-day disconnect & reconnect of the power for when we do the panel upgrade to 200 amps. A mast on the house You will need to call your utility company and ask about the procedures for applying for temporary power. ~ $500 now since the COVID. On a temp panel, you shouldn't need to be working in it. I have just received this letter in the mail stating that my private power pole is defective and could possibly become dangerous, and that The amount of resources required is a moot point. The radius of the support stays are 2 metres from the base of the pole. Reply reply Ground rod for temporary power pole used during the build most likely. I paid them back 1/2 their cost since where i was going to run power from was a lot more expensive. Frequently six month old poles are taken down and dropped at the landfill or sold for scrap. I had to drill pilot holes into the Starlink pole. All you have to provide is a pole and a box, with many utilities: Well, a pole barn is something that is great for solar PV so perhaps throw a lot of solar PV on the roof to generate your own power. The only thing changing would be the connection point of the power line on the PGE side. Step 3: Call electric company and ask for power to be run to the pole. Pretty sure the energy oligarchy is a failure that combines the absolute worst of Reddit iOS Reddit Android Reddit Premium About Reddit Advertise Blog Careers Press. They let Alabama Power set the rates and the rates are changing during the time of the year/season. I’m Australia we using temporary power poles connected to the main grid to suffice for the build , which must be remove at the end of construction and a permanent pole must be installed . View community ranking In the Top 1% of largest communities on Reddit. The CO pole, which is approx 100' from the future house, will provide temporary power during construction as well as permanent power The cost range for having a temporary power pole installed and connected to the electrical grid is $1,200 – $2,850. Bonding and conduit fill and spacing codes I've looked into thoroughly. ONE FINAL CONSIDERATION ::: keep in mind that this mod MODIFIES the existing power pole prototype definition. GameStop Moderna Pfizer Johnson & Johnson AstraZeneca Walgreens Best Buy Novavax SpaceX Tesla. I hope i helped with the poles though. Basically, they cut the pole at the ground, slide the top part of the pole over, pull out the old stub from the hole, and set a new pole in the existing hole. Temporary electric connections (labor time install/maintain, materials, site location, utility charges for excess facilities (if multiple poles are required), utility deposits, higher commercial electric rates, etc) are very expensive. Contact National today! Main Navigation Menu. It took this long for LADWP to spot a new meter. I contacted Bell who sent a technician to check, and he said that it definitely wasn’t their (or the previous MT&T) pole. Temporary power pole for work sites. I had a separate power pole placed first with outdoor 120V and 240V outdoor outlets for instant shore power then my shop got its own subpanel later It is attached to the flag pole with two galvanized screws. Under the right scenario, temporary power is a smart and low-cost alternative to other options on the market today. CMP themselves showed up to switch the power over and dismantle the old over head line. A cost estimate will be provided. Call: 800 Temporary Power Cost by Type of Power Panel. I’ve installed up to 2000A services and never had an The government wants people to invest in energy, as public policy. They quote about 3 grand. 00 Jersey Central Power & Light $266. I removed it from the flag pole and drilled out the center of it, to the diameter of the Starlink pole. It is just to provide power for construction purposes. Other potential costs could include tree trimming, temporary power connections, grant of easement, rock removal to enable pole installation and inspections. And the building already on the property does it have its own power or does the power come from the house if it has its own power the it’s just a matter of adding a breaker and right size wire for your RV Temporary support poles in the basement found on inspection. It's a 200amp service. Alhambra; Bell Gardens; The issue I'm seeing at the moment is that almost all the various battery setups use Anderson power poles. This is what I do: Set up a temporary power pole to be used during construction. I know someone who had a similar problem and NSP tried to get them to pay something like $10k, but this person fought them on it and eventually NSP covered the cost. It's about distance not necessarily number of poles. If you 100% have to use poles than things get annoying. I asked who owns the pole then, and they said it could be the phone company or maybe the cable tv company. I was paying roughly $. We are getting power to the property next month sometime. Better have a few folks helping balance it. That was 10 Here, we use a temp panel that has either a 50A and 20A breaker, or just a 20A breaker. I drilled holes at the top of the poles and put small hooked bolts. My neighbors were agreeable, but didn't want the pole on their lawn, so we had to stretch the line from the road all the way across their lawn to a pole on my lawn. Even though outlets are still bare, code allows to have receptacles for further construction use. 00 Met-Ed and Penelec Residential Service: $225. 00 Penn Power $225. if you want 100% coverage of an area, you have substations which have a much higher coverage footprint anyway. Is there a way to convert the existing cable or do I need to track down & buy a different power cable? Thanks for the information. When I say line distance, that's the actually distance of the power lines, which is not necessarily the shortest distance from nearest street pole. 56 Mon Power, Potomac Edison Under normal circumstances, we supply — free of charge — up to 92 meters of pole and service line installation from an approved attachment point. the code is a tad more complex (i could probably figure it out in an afternoon vs. For residential temporary power, the temporary pole price is indeed rather high. I've heard from a couple of pros that say the feed lines need to attach to the upper meter lugs and the load lines connect to the lower meter lugs. After electrical rough-in, and passing of an inspection, I request that the electric company move the meter from the temporary power pole to the meter socket on the house. You'll have hundreds of poles ready when you need them. I need to get temporary power hooked up on our property. I In my area I will put in a temp power pole for about $350 and the local power company only charges their account setup fees. The reduction of lumber exposed to both the outside and inside surfaces reduces thermal bridging and makes a pole building thermally efficient when insulated. Join and Discuss evolving Given the cost of installation and permits compared to the very modest to get LADWP to come out in 10 weeks. So check with Average cost To Install A Temporary Power is about $1,165 . Well you mention temp power and Florida in the same paragraphand we get about 10 of those calls a day. New home builds get one pole with hook up but extra poles with line run about 3 to 3500. The last time I read the figure, western Power had around 50% of their HV distribution lines feed 3% Keep an eye out for road construction where the lines are temporarily moved. (Not only do they have The Underground Power Project is due for completion in my suburb in the first quarter of 2023. People hit power poles more often than you'd think. lol so much for temporary. There's a garden hose strung along the extension cord, too. I think they even pulled the new cable but don’t quote me on that. If they hit bedrock they charge extra. Then used 1” emt conduit for poles. 0 wooden poles here, I was actually astonished the first few times I went abroad to Germany, Belgium and France, to see them in The reduction in total cost of gsupps could be accounted for by raising the cost of things like local power poles and rails to ensure spam is kept to a Your Reddit account must be more than 1 day old in order to post! Take that time to search the sub and read about your issue before posting! Members Online. Now if the unit reaches the cutoff temp, it will disengage the compressor and you will save power as it isn't running. Made short work of pulling 6" round poles. nwptlcalygnqxmnsnircnawktnbfhnehhnnzfdnnfhfwavtjx