Method statement for pole installation. The sling shall not be wrapped tight around the pole.
Method statement for pole installation This document outlines the method for installing new street lighting poles as part of a street lighting project. . Should the user be unsure on the guidance provided in this document, please contact International Utility Poles. Suitably experienced and qualified personnel should be used for the assembly and installation of light poles. This purpose of this procedure is to ensure concrete pole lifting & erection to provide the safely installation and as per the design requirement and specification. 3. For these the contractor must be familiar with the owner’s plans and specifications and the American Lite Pole submittal drawings (if any). This method statement covers all the construction sequences involved in street light foundation works. Special features required by individual owners may require unique installation methods. Prepare the Method Statement and related submission, coordination and supervise during installation at site. Prior to start the work, all required permits and clearances to be obtained from concerned authorities and the applicable PTW shall be available all the time at work location. It describes transporting and handling poles safely, unloading them from vehicles, lifting poles into their final placement using slings, excavating holes, and installing the poles via backfilling around them with sand or METHOD STATEMENT INSTALLATION OF ELECTRICAL PANELBOARDS & ENCLOSED CIRCUIT BREAKER (WALL MOUNTED) 1. This document outlines the procedure for installing concrete poles. Key steps include securing poles on trucks with chains, unloading poles one at a time and chocking those remaining, lifting poles using slings around the balance point, and excavating holes using augers at the proper depth and diameter for each pole. It describes: [1] offloading poles from containers using a crane; [2] assembling pole arms and running internal wiring; [3] lifting poles into place with crane and bolting them to foundations; [4] terminating main power and earth Methods of horizontal pole assembly are detailed. 3 Attach a single loop sling around the pole at approximately two thirds of the overall height, taking care not to damage the pole finish (synthetic slings should be used for painted product). The sling shall not be wrapped tight around the pole. INTRODUCTION The p. Key steps include securing poles on trucks with chains, unloading poles one at a time and chocking those remaining, lifting poles using slings around the balance point, and excavating holes using augers at the proper depth and diameter for each pole. Electrical Site Engineer shall be responsible for checking the cable drum length schedule, lighting poles, lighting fixture and other associated materials before starting. 1 each site should determine, document and train its personnel in safe work methods relevant to the site and to the pole assembly and installation. gdorctqatythksmcopfirkognjmuxxnduptwwpsoihousmk